Ducker Preparations

In order to proceed with the Ducker hull, I need more room in the garage. So, last month I added a small addition to the backyard shed we built 10 years ago. All of our gasoline equipment, tools, cans, etc. are now housed there. I wagged an estimate of $650 in materials to complete the space. It ended up more like $800. That’s $14.25 a SF. If you threw in my free labor in there I guess you could triple the cost. The worst of the project required digging 2 holes for the outboard post footings. Nothing but hard clay and rock (lots of rocks). Thankfully I had my 18 yr old son and his buddy to sweat the digging with me.

img_1111

The low slope roof just sneaks under the existing gable window. 30# felts are under the shingles. The Hardi Plank siding was nasty to cut with circular saw or jig. Finally, I discovered that 3 scores with a utility knife on both sides allowed for a clean enough break without all the dust. Some policing of the adjoining grade still needs to be done. Also, the soffit vents are still missing, but we can move on now.

img_1112

In the interim, LUNA’s hatch has been repaired, again, and both the boat hook and bilge pump handle have been stripped and varnished.

IMG_1114.JPG

Next up: can we make UNA a boat cover out of Emily’s 2 awnings? Solving that will allow UNA to stay outdoors temporarily while the Ducker hull takes shape. I may begin with the spars and other parts before that.

Advertisement

2 thoughts on “Ducker Preparations

    1. Hey Mike, I think it’s a chestnut oak. Many have been blighted here. Not sure they are good boat building wood. May need to check. Had one die, milled it and made counter tops in Luna. Pretty wood.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s